Title page for 93332019


[Back to Results | New Search]

Student Number 93332019
Author Ching-Hui Peng(彭競輝)
Author's Email Address No Public.
Statistics This thesis had been viewed 1813 times. Download 2021 times.
Department Executive Master of Civil Engineering
Year 2007
Semester 2
Degree Master
Type of Document Master's Thesis
Language zh-TW.Big5 Chinese
Title 都市焚化廠設施維護管理之研究--以台北縣八里焚化廠為例
Date of Defense 2008-07-12
Page Count 111
Keyword
  • Auditing and Certification
  • Maintenance Management
  • Refuse Incineration Plant
  • Abstract Environmental Protection Administration actively promoted the large-scale refuse incineration plant since the 80th year of the Republic of China, up to now these are 21 plants have been completed and operation successfully, refuse disposal total amount of 21,900 tons as every day. This refuse recycling through the modernized equipment can make waste disposal reach the goals of reduction, stable melting, hygiene and recyclable treatment. Operation objective of refuse incineration plant shall devote to continually upgrade its operation management and maintenance abilities for improving equipment service life and efficiency
    In order to improve equipment service life, the estimated period of equipment service lift and maintenance management shall be established for increasing equipment available and reducing repair cost. Most staff maintains and operates waste incinerators to adopt passive method and keeping basic function only. But old equipment need to be restored and recovered original function, we shall consider that actively maintenance will improve equipment available and increase service lift, therefore, actively maintenance differ with traditional method. 
    This research makes use of the Environmental Protection Administration of executive organ to operate the large-scale refuse incineration plant, and improve efficiency. In accordance with Regulated Recyclable Waste Incinerators Auditing and Certification Regulations to make analysis of operation, working and maintenance for improving maintenance management of refuse incineration plant.
    Table of Content 中文摘要-------------------------------------i
    英文摘要-------------------------------------ii
    誌謝-------------------------------------------iii
    總目錄----------------------------------------iv
    圖目錄----------------------------------------vii
    表目錄----------------------------------------viii
    第一章 緒論---------------------------------------------------1
    1.1前言--------------------------------------------------1
    1.2研究動機-------------------------------------------1
    1.3研究目的-------------------------------------------2
    1.4研究範圍-------------------------------------------2
    1.5研究方法-------------------------------------------3
    1.6研究架構及流程-----------------------------------3
    第二章 文獻回顧----------------------------------------5
    2.1設施維護管理之理念與意義------------------------5
    2.1.1.設施維護管理之定義----------------------------5
    2.1.2.維護方式與維護管理分類---------------------------6
    2.1.3.生命週期成本與故障維護---------------------------8
    2.1.4.設施維護管理作業程序---------------------------15
    2.2台灣地區與國外焚化廠運轉維護經驗的比較------------16
    2.2.1.國外焚化爐經驗簡述-------------------------------16
    2.2.2.處理流程------------------------------------------17
    2.2.3.能源回收-------------------------------------------18
    2.2.4.操作營運模式-----------------------------------19
    2.2.5.公害防治控制-----------------------------------20
    2.3國內焚化爐廠維護管理相關法規探討----------------21
    2.3.1.垃圾處理相關法規的沿革---------------------------21
    2.3.2.焚化廠興建相關法規-------------------------------22
    2.3.3.法令規章之要求-----------------------------------26
    2.4評鑑的定義與執行原則---------------------------28
    2.4.1.評鑑的定義---------------------------------------28
    2.4.2.評鑑原則------------------------------------------28
    第三章 焚化廠設備維護管理之探討-------------------30
    3.1焚化廠生命週期管理機制之建立-------------------30
    3.1.1.提昇焚化廠使用年限之管理--------------------31
    3.1.2.加強焚化廠維護管理措施-----------------------45
    3.2焚化廠主要設備之保養及維護-----------------------51
    3.2.1.主要設備保養維護-------------------------------53
    3.2.2.法定維護------------------------------------------62
    3.3焚化廠維護費用之分析---------------------------67
    3.3.1.焚化廠營運及維護-------------------------------67
    3.3.2.營運及維護費用-----------------------------------67
    3.3.3.維護保養費用分析—以八里焚化廠為例------------70
    3.4本章小結--------------------------------------------73
    第四章 藉評鑑制度提昇焚化廠維護管理之探討----74
    4.1提升焚化廠維護管理之評鑑制度-------------------74
    4.1.1.緣起與目的--------------------------------------74
    4.1.2.績效評鑑制度之執行方式-----------------------74
    4.1.3.績效評鑑辦法及結果說明-----------------------75
    4.1.4.藉評鑑制度提昇焚化廠維護管理之策略--------82
    4.2八里焚化廠評鑑之實績探討-92~95年度查核評鑑為例-85
    4.2.1.焚化廠查核評鑑作業之流程 ----------------------85
    4.2.2.八里焚化廠執行成果分析 -------------------------87
    4.3本章小結------------------------------------------92
    第五章 結論與建議--------------------------------------93
    5.1結論--------------------------------------------------93
    5.2建議--------------------------------------------------95
    參考文獻--------------------------------------------------97
    附錄一 八里焚化廠區平面配置 ---------------------------- 99
    附錄二 八里焚化廠處理流程圖 ---------------------------- 100
    附錄三 94年度垃圾焚化廠現場評鑑自評表 --------------- 101
    附錄四 95年度查核評鑑紀錄彙整說明 -------------------- 109
    Reference 1.行政院環境保護署全球資訊網站 :http://www.epa.gov.tw/。
    2.行政院環境保護署垃圾焚化興建工程處網站:http://ww2.epa.gov.tw/swims。
    3.行政院環境保護署環境督察總隊台北辦公室網站(原環保設施管理中心):http://ivy4.epa.gov.tw/swims。
    4.行政院環境保護署垃圾資源回收廠興建工程處(1985):垃圾焚化廠處理設施設置規範。
    5.行政院環境保護署(2001), 已運轉垃圾焚化廠操作營運輔導查核及績效評鑑實施要點。
    6.中興電工機械股份有限公司(2001),台北縣八里垃圾資源回收廠委託營運操作管理計畫書。
    7.中興電工機械股份有限公司(2001),台北縣八里垃圾資源回收廠,年度保養及維護計畫與程序書。
    8.中興電工機械股份有限公司(2006),台北縣八里垃圾資源回收廠,95年查核評鑑成果報告書。
    9.中興電工機械股份有限公司(2001),台北縣八里垃圾資源回收廠,焚化廠預算成本控制及提升營運績效要點。
    10.中興電工機械股份有限公司(2001~2006),台北縣八里垃圾資源回收廠,八里垃圾焚化廠年度操作管理支出明細表及月報表。
    11.達和環保服務股份有限公司(2008),台北縣政環境保護局八里垃圾焚化廠,建立生命週期制度報告書。
    12.達和環保服務股份有限公司(2008),台北縣政環境保護局八里垃圾焚化廠,保養及維修計畫書。
    13.劉明國,『建築物用途別之分類研究與建築物之使用管理』,中華民國建築學會,76。
    14.鄭達材,『設備維護管理-現在與未來』,中國生產力中心出版,89.05。
    15.楊冠雄,『建築物設備使用管理計畫與節能效益調查研究』,內政部建築研究所,83.05。
    16.郭崑謨,『管理概論』,三民書局出版,87.08。
    17.林信一、張木彬(2005),『台灣垃圾焚化廠建設紀要及未來展望』,中興工程科技研究發展基金會,長榮大學職業安全與衛生學系暨研究所。
    18.林志棟計畫主持,「公共工程維護管理經費編審及查核制度之研究」計畫期末報告,行政院公共工程委員會委託研究計畫,財團法人台灣營建研究院。
    19.陳燕菁,「學校建築維護管理制度之探討」,國立台灣大學土木工程研究所碩士論文,86.06。
    20.蕭樂同(2005),『營區設施維護管理策略之研究』,碩士論文,中央大學土木工程研究所。
    21.黃志評(2008),『省、縣道橋樑檢測及評鑑制度之探討—以交通部公路總局為例』,碩士論文,中央大學土木工程研究所。
    22.張銘哲(2004),『公有民營垃圾焚化廠運作績效之研究—以嘉義鹿草 焚化廠為例』,碩士論文,國立中山大學環境工程研究所。
    23.吳懿霖(2002),『北部地區都市垃圾焚化爐歲修清爐勞工戴奧辛暴露評估』,碩士論文,國立成功大學環境醫學研究所。
    Advisor
  • Jyh-Dong Lin(林志棟)
  • Files
  • 93332019.pdf
  • approve immediately
    Date of Submission 2008-07-23

    [Back to Results | New Search]


    Browse | Search All Available ETDs

    If you have dissertation-related questions, please contact with the NCU library extension service section.
    Our service phone is (03)422-7151 Ext. 57407,E-mail is also welcomed.