Title page for 88426009


[Back to Results | New Search]

Student Number 88426009
Author Quo-Li Ke(柯瓊琍)
Author's Email Address No Public.
Statistics This thesis had been viewed 1912 times. Download 1727 times.
Department Graduate Institute of Industrial Management
Year 2000
Semester 2
Degree Master
Type of Document Master's Thesis
Language zh-TW.Big5 Chinese
Title 訂單生產環境下之BOM內各品項生產規劃之決策問題
Date of Defense 2001-07-05
Page Count 78
Keyword
  • 物料清單
  • 規劃策略
  • 訂單生產
  • 計劃生產
  • Abstract none
    Table of Content 目錄..........................................................Ⅰ
    圖目錄........................................................Ⅲ
    表目錄........................................................Ⅳ
    第一章 緒論....................................................1
    1.1 研究背景與動機...........................................1
    1.2 問題敘述.................................................4
    1.3 研究目的.................................................5
    1.4 研究方法及進行步驟.......................................6
    1.4.1 研究方法.............................................6
    1.4.2 進行步驟.............................................7
    第二章 文獻探討................................................8
    2.1 存貨生產與訂單生產.......................................8
    2.2 具存貨生產(MTS)特性的生產模式之文獻...................13
    2.3 具訂單生產(MTO)特性的生產模式之文獻...................17
    2.4 具存貨生產與訂單生產並存特性的生產模式之文獻............20
    2.5 型態延遲................................................24
    第三章 整數規劃模型(Integer Programming Model)..............27
    3.1 環境假設與問題特性......................................27
    3.1.1 環境假設............................................27
    3.1.2 問題特性............................................28
    3.2 符號定義與I. P.模型.....................................29
    3.2.1 符號定義............................................29
    3.2.2 整數規劃............................................30
    3.3 整數規劃模型(I.P. Model)之求解........................33
    3.3.1 釋例................................................33
    3.3.2 以I.P.模型解此問題..................................34
    3.4 分枝定界法..............................................35
    3.4.1 分枝原則............................................35
    3.4.2 成本計算原則........................................38
    3.4.3 分枝定界法之執行步驟................................39
    3.5 分枝定界法之驗證........................................41
    3.6 結論....................................................42
    第四章 訂單生產環境下之BOM內各品項生產規劃之決策問題之啟發式演
    算法...................................................43
    4.1 啟發式演算法之架構......................................43
    4.2 初始解之演算法..........................................43
    4.2.1 尋找初始解之步驟....................................45
    4.3 鄰近解(neighborhood)之定義............................46
    4.4 啟發式演算法之求解流程..................................50
    4.5 比較啟發式演算法與數學模型之實驗分析....................52
    4.5.1 不同參數組合下之測試................................52
    4.5.2 不同問題規模下之測試................................54
    4.5.3 不同初始解之測試....................................57
    4.5.4 解題時間之比較......................................58
    第五章 結論...................................................60
    5.1 研究貢獻................................................61
    5.2 研究限制................................................62
    5.3 未來研究之方向..........................................62
    參考文獻......................................................63
    附錄A:I.P.模式執行BOM內6個品項生產規劃之決策問題之程式內容...66
    附錄B:釋例之參數內容.........................................71
    Reference 王柏昌,“考量晶圓製造廠混合生產環境整體績效之繼產活動控制方法“,國立交通大學工業工程研究所碩士論文,1998。

    Anupindi, R. and Tayur, S. (1998),“Managing stochastic multiproduct systems: model, measures, and analysis,”Operations Research 46 Supp.3, S98-S111.
    Arreola-Risa, A. and DeCroix G. A. (1998),“Make-to-order versus make-to-stock in a production inventory system with general production times,”IIE Transactions 30,705-713.
    Dellaert, N. P. and Melo M. T. (1996),“Production strategies for a stochastic lot-sizing problem with constant capacity,” European Journal of OperationalResearch 92,281-301.
    Feitzinger, E. and Lee, H. (1997),“Mass Customization at Hewlett-Packard:The Power of Postponement,”Harvard Business Review January-February,121.
    Federgruen, A. and Katalan, Z. (1999),“The impact of adding a make-to-order to a make-to-stock production system,” Management Science 45/7,980-994.
    Grubbstrom, R. W. and Ovrin, P. (1992),“Intertemporal generalization of the relationship between material requirements planning and input-output analysis,”
    International Journal of Production Economics 26, 311-318.
    Grubbstrom, R. W. (1996), “Stochastic properties of a production-inventory process with planned production using transform methodology,”InternationalJournal of Production Economics 45, 407-419.
    Grubbstrom, R. W. (1998),“A net present value approach to safety stocks in planned production,”International Journal of Production Economics 56-57, 213-229.
    Grubbstrom, R. W. (1999),“A net present value approach to safety stocks in amulti-level MRP system,”International Journal of Production Economics 56-57, 213-229.
    Hendry, L.C. and Kingsman, B.G. (1989),“Production planning systems and their applicability to make-to-order companies,” European Journal of Operational Research 40, 1-15.
    Lee, H. (1994),“Effective Inventory and Service Management Through ProductandProcess Redesign,”Operations Research 44/1, 151-159.
    Lee, H. and Tang, C.S. (1997),“Modelling the Cost and Benefit of Delayed Product Differentiation,” Management Science 43, 40-53.
    Kogan, K., Khmelnitsky, E. and Maimon, O. (1998),“Balancing Facilities in Agregate Production Planning: Make-to-order and Make-to-stock Environments,” International Journal of Production Research 36, 2585-2596.
    Kingsman, B., Hendry, L., Mercer, A., and Souza, A. (1996),“Responding to Customer Equiries in Make-to-order Companies: Problems and Solutions,”International Journal of Production Economics, 46-47, 219-231.
    Martel, A., Diaby, M. and Boctor, F.(1995),“Multiple items procurement under stochastic nonstationary demands,”European Journal of Operational Research 87, 74- 92.
    Nguyen, V. (1998),“A Multiclass Hybrid Production Center in Heavy Traffic,”Operations Research, 46/3, S13-S25.
    New, C. C. and Szwejczewski, M. (1995),“Performance Measurement and the Focused Factory: Empirical Evidence,” International Journal of Operations & Production Management, 15/4, 63-79.
    Ozdamar, L. and Yazgac T.(1997),“Capacity driven due date settings in make-to-order production systems,”International Journal of Production Economics49, 29-44.
    Silver, E.A. and Peterson, R. (1985),“Decision Systems for Inventory Management and Production Planning,”Wiley, 2nd edn., New York.
    Sox, C. R., Thomas L. J. and McClain J. O. (1997),“Coordinating production and inventory to improve service,” Management Science 43/9, 1189-1197.
    Samadhi, T. M. A. and Hoang, K. (1995),“Shared Computer-integrated Manufacturingfor Various Types of Production Environment,”International Journal of Operations & Production Management, 15/5, 95-108.
    Sipper, D. and Bulfin, Jr.(1997),“Production: Planning, Control, and Integration,”McGraw-Hill.
    Vollman, T. E., Berry, W. L. and Whybark, D. C. (1997), “Manufacturing Planning and Control System,”Irwin/McGraw-Hill.
    Williams, T. M.(1984),“Special products and uncertainty in production/inventory systems,”European Journal of Operational Research 15, 46-54.
    Wein, L. M. (1997),“Dynamic scheduling of a multiclass make-to-stock queue,” Operations Research 40/4, 724-735.
    Yucesan, E. and Groote, X. D. (2000),“Lead time, order release mechanisms, and customer service,”European Journal of Operational Research 120, 118-130.
    Zipkin, P. H.(1995),“Performance analysis of a multi-item production-inventorysystem under alternative policies,” Operations Research 41/4, 690-703.
    Advisor
  • Gwo-Ji Sheen(沈國基)
  • Files
  • 88426009.pdf
  • approve immediately
    Date of Submission 2001-07-05

    [Back to Results | New Search]


    Browse | Search All Available ETDs

    If you have dissertation-related questions, please contact with the NCU library extension service section.
    Our service phone is (03)422-7151 Ext. 57407,E-mail is also welcomed.