  • Abstract Cost estimating at the planning or preliminary design phase is usually performed by experienced estimators based on past experiences. However, domestic construction companies are relatively small in which frequent personnel turnover impedes transition of the experiences. This research attempts to solve the above problem by employing a case-based reasoning (CBR) technique into a computer system that comprises of 102 past construction cases. The input to the system is a set of building related parameters that include name of county, site area, floors above ground, floors below ground, gross floor area, exterior wall area, and perimeter of basement. The output of the system is a set of various costs for temporary construction, foundation, structure, exterior wall, rough interior, finishes, elevator, plumbing, and HVAC, etc. The CBR system provides construction rookies, the contractor as well as the owner a whole picture of the construction costs to facilitate the construction progress.
    Table of Content 第一章 緒論.................................................................................................................1 1.1研究動機..............................................................................................................1 1.2研究目的..............................................................................................................2 1.3研究範圍..............................................................................................................3 1.4研究方法與流程..................................................................................................3 1.5 論文架構.............................................................................................................4 第二章 文獻回顧.........................................................................................................6 2.1工程估價與成本預算在營建工程的角色..........................................................6 2.1.1 工程估價......................................................................................................6 2.1.2 概略估價計算方法......................................................................................7 2.1.3 概略估價之目的..........................................................................................8 2.1.4 建築工程估價的分類及編造次序..............................................................8 2.1.5 工程估價相關研究....................................................................................10 2.2 案例式推理法(CASE-BASED REASONING)..................................................12 2.2.1 CBR之理論架構........................................................................................12 2.2.2 專家知識....................................................................................................13 2.2.3 CBR之知識擷取........................................................................................13 2.2.4 CBR之優點................................................................................................14 2.2.5 CBR之應用研究........................................................................................15 2.3 特徵向量法.......................................................................................................16 2.3.1 建立成對比較矩陣....................................................................................17 2.3.2 計算特徵值、特徵向量............................................................................17 2.3.3 一致性檢定................................................................................................18 第三章 系統研析與開發...........................................................................................20 3.1 系統發展目標...................................................................................................20 3.2 系統使用者.......................................................................................................21 3.3 系統輸入與輸出...............................................................................................21 3.3.1系統輸入.....................................................................................................21 3.3.2系統輸出.....................................................................................................22 3.4 系統限制...........................................................................................................23 3.5 案例蒐集與整理...............................................................................................23 3.5.1 案例蒐集....................................................................................................23 3.5.2 案例整理....................................................................................................23 3.6 案例式推理機制...............................................................................................25
    3.6.1 索引(Index Assignment).......................................................................27 3.6.2 屬性權重....................................................................................................28 3.6.3 屬性相似度................................................................................................30 3.6.4 調整(Modification、Revise)................................................................31 3.6.5 系統推理流程............................................................................................32 3.7 系統架構...........................................................................................................33 3.7.1 物件樹(Object Tree).............................................................................33 3.7.2 層級(Class)...........................................................................................33 3.7.3 實體(Instance)......................................................................................34 3.7.4 物件方法(Method)...............................................................................34 3.7.5 功能函式(Function).............................................................................36 3.8 小結...................................................................................................................37 第四章 系統操作與驗證...........................................................................................39 4.1 軟硬體配備.......................................................................................................39 4.2 系統操作...........................................................................................................40 4.2.1 估算流程說明............................................................................................40 4.2.2 案例庫管理................................................................................................42 4.2.3 權重修改....................................................................................................42 4.2.4 已估算案例查閱........................................................................................43 4.3 系統驗證...........................................................................................................44 4.3.1 測試案例....................................................................................................44 4.3.2 各項工程費用測試結果............................................................................44 4.3.3 結構體工程數量估算結果........................................................................45 4.4 小結...................................................................................................................46 第五章 結論與建議...................................................................................................47 5.1 結論...................................................................................................................47 5.2 後續研究與建議...............................................................................................47 參考文獻.....................................................................................................................49 附錄..............................................................................................................................52 附錄一 參數估價表................................................................................................52 附錄二 問卷............................................................................................................53 附錄三 系統測試結果............................................................................................66 附錄四 整理案例-集合住宅...................................................................................67 附錄五 整理案例-行政辦公大樓...........................................................................71
    Reference 1. 陳耀光,「追求永續經營先做好營建管理」,現代營建,No179,民國83年11月。 2. 林志明,應用案例式推理、灰色關聯分析法發展產品設計評估決策支援系統,中央大學工業管理研究所碩士論文,民國88年6月。 3. http://www.axon.com.tw/axon/PRODUCTS/AI/CBR/cbr.htm 4. 黃坤泰,「預算編列與執行」,內政部營建署工地主任訓練班教育講習訓練系列。 5. 李建雄,「建築估價(修定版)」,詹式書局,民國84年8月。 6. 謝浩明,「預算編列與執行(一)」,內政部營建署工地主任訓練班教育講習訓練系列。 7. 劉慶禧,「建築工程估價」,科技圖書股份有限公司,民國85年。 8. 陳信夫,建築工程成本估算法之比較研究 --- 與類神經網路估算法之研究,國立台灣大學土木工程研究所碩士論文,1995。 9. 郭坤池,規劃設計階段使用之參數估價研究----以八十二年度台中市之十三 、十四層RC造集合住宅為例,淡江大學建築(工程)學系碩士論文 ,1993。 10. 鍾恕,工程估價系統個體導向模式之分析,國立台灣大學土木工程研究所碩士論文 ,1990。 11. 黃春田,工程估價精確度預測之分析,國立台灣科技大學營建工程技術學系碩士論文 ,1992。 12. 張耀南,電信營建工程估價型態之分析,國立交通大學管理科學研究所碩士論文 ,1992。 13. 楊舜清,工程估價與物料管理資訊整合應用模式,國立台灣科技大學營建工程技術學系碩士論文 ,1997。 14. 施勝華,物件導向技術應用於房屋結構工程估算系統雛型之研究,中華大學土木工程學系碩士論文,1998。 15. Kamal M. Al-Harbi, David W. Johnston, and Habib Fayadh, “Building Construction Detailed Estimating Practices in Saudi Arabia”, Journal ofConstruction Engineering and Management, Vol. 120, No. 4, December 1994, pp. 774-784. 16. Thomas M. Walski, ”Estimating O&M Cost when Costs Vary with Flow”, Journal of Water Resources Planning and Management, Vol. 110, No. 3, July 1984, pp. 355-360. 17. W. Edward Back, Walter W. Boles, and Gary T. Fry,” Defining Triangular Probability Distributions from Historical Cost Data”, Journal of Construction Engineering and Management, Vol. 126, No. 1, January/February 2000, pp. 29-37. 18. Tarek Hegazy, and Amr Ayed,” Neural Network Model for Parametric Cost Estimation of Highway Projects” ,Journal of Construction Engineering and Management, Vol. 124, No. 3, May/June 1998, pp. 210-218. 19. Hojjat Adeli, and Mingyang Wu, “Regularization Neural Network for Construction Cost Estimation”, Journal of Construction Engineering and Management, Vol. 124, No. 1, January/February 1998, pp. 18-24. 20. Cheng Yeh, “Quantity Estimating of Building with Logarithm-Neuron Networks” Journal of Construction Engineering and Management, Vol. 124, No. 5, September/October 1998, pp. 374-380. 21. 施育仁,半導體後段製程生產設備維修決策支援系統之研究,國立台灣科技大學生產系統工程與管理碩士論文 ,2000。 22. 李欣運,工程進度規劃自動評核與建議系統架構之研究,交通大學土木工程系碩士論文,1998。 23. 董其鈞,案例式推理應用於營建工程爭議調解之研究,交通大學土木工程系碩士論文,2000。 24. 林昇獎,案例式輔助工具在建築結構初步設計之應用,淡江大學土木工程學系碩士論文,1996。 25. 吳文良,案例式系統在工程投標初步決策之應用,淡江大學土木工程學系碩士論文,1996。 26. 魏洪泰,全球資訊網建築案例資料庫系統之建構,成功大學建築學系碩士論文,1998。 27. 李斯緯,建築案例多媒體資料庫之建構,淡江大學建築學系碩士論文,1999。 28. Simon F. Bailey, and Ian F. C. Smith,” Case-Based Preliminary Building Design”, Journal of Computing in Civil Engineering, Vol. 8, No. 4, October 1994, pp.
    50
    454-468. 29. W. M. Kim Roddis and John Bocox﹐ “Case-Based Approach for Steel Bridge Fabrication Errors”﹐Journal of Computing in Civil Engineering, Vol. 11, No. 2, April 1997, pp. 84-91. 30. Smith, “Building expert systems in case-base law” , Expert Systems With Application, Vol.4,No.4,pp335~342,1992. 31. 曾國雄,鄧振源,AHP的內涵特性與應用(上)、(下),中國統計學報,第27卷,第六期,頁5-22、第七期,頁1-20。 32. 陳俊賓,案例式推理在橋樑上部結構工法評選之應用,國立台灣科技大學營建工程技術學系碩士論文 ,1998。 33. Janet Kolodner, "Case-Based Reasoning",Morgan Kaufmann Publisher,1993, p355.
    Advisor
  • Nie-Jia Yau(姚乃嘉)
  • Files
  • 88322098.pdf
  • approve immediately
    Date of Submission 2001-07-10

    [Back to Results | New Search]


    Browse | Search All Available ETDs

    If you have dissertation-related questions, please contact with the NCU library extension service section.
    Our service phone is (03)422-7151 Ext. 57407,E-mail is also welcomed.